Risk Assessment and Management for High-Speed Rail Systems

PROJECTS
Funding
Portugal
Portugal Flag
Duration
-
Status
Complete with results
Geo-spatial type
Other
Project website
Project Acronym
RISK
STRIA Roadmaps
Infrastructure (INF)
Transport mode
Rail icon
Transport policies
Safety/Security,
Societal/Economic issues
Transport sectors
Passenger transport,
Freight transport

Overview

Background & Policy context

High-Speed Rail (HSR) system’s construction and operation is a complicated management subject involving environmental issues, train schedules, safety, rolling stock and infrastructure reliability (transport infrastructures are critical and vulnerable). The design and safety/performance assessment of transportation facilities should include an understanding of the physical environment and also take into account various other dimensions of risk. In a global framework, technical risks as well as natural hazards risks must be considered, in both assessment and management perspectives. The project aims at incorporating environmental risks (e.g. hydrologic, geotechnical and seismic), technical risks (e.g. excessive vibrations) and robust measures into decision models for proactive risk management.

Objectives

The project is organized around the following specific objectives:

  • Characterizing hydrologic risk (rainfall and flood hazards) along the high-speed rail line
  • Characterizing geotechnical and seismic risks and establishing mitigation strategies
  • Developing, validating, and applying advanced methodologies for the analysis and assessment of the effects of mitigation measures to the risk of excessive vibrations (or deformations) in the railway track induced by the circulation of trains at high speeds
  • Developing Decision Analysis Tools for HSR construction along with the associated optimization approaches for the allocation of resources
  • Developing, validating, and applying advanced methodologies for the assessment of earthquake effects on the infrastructures of high-speed railway systems, and developing a methodology for the implementation of an integrated monitoring system for railway systems

Funding

Parent Programmes
Institution Type
Public institution
Institution Name
Fundação para a Ciência e a Tecnologia (FCT)
Type of funding
Public (national/regional/local)

Results

  • Estimation of extreme rainfall events, e.g. in the form of intensity-duration-frequency (IDF) curves, which can be used to evaluate slope stability and flood risk and predict the frequency of unfavourable operating conditions due to intense rainfall.
    • Development of enhanced geology decision-making model to predict/avoid major accidents during tunnel construction. The model allows use of parameters observed during tunnel excavation to serve as alarms and implement mitigating measures.
  • Extension of Decision Aids for Tunnelling (DAT) to any linear/networked infrastructure with specific application to the high speed rail lines in Portugal, enabling cost/time prediction under uncertainty.
  • Development of optimization model using simulated annealing that allows one to optimize rail/highway alignments under a variety of technical, operational and environmental constraints.

Partners

Lead Organisation
EU Contribution
€0
Partner Organisations
EU Contribution
€0

Technologies

Contribute! Submit your project

Do you wish to submit a project or a programme? Head over to the Contribute page, login and follow the process!

Submit