Overview
The objective of this project is to design and test a highly efficient automated and/or assisted process for the lay-up operation of the manufacturing of composite stiffeners, with a competitive cost advantage comparing to the current hand lay-up process.
Different process/cell architecture will be studied during the preliminary design review (as DFP, AFP, Pick and place, NCF) and consolidated by preliminary trials if necessary to select a process with the topic manager which will be developed in critical design review and tested during trials and the parts manufacturing step.
Four full scale composites parts will be manufactured and tested thanks to laboratory cell to demonstrate the maturity level of the process proposed.
A mass projection study will be realised to consolidate the prospective of the process tested and approved in serial production (production capabilities, RC/NRC)