CONtributing to Shift2Rail's NExt generation of high Capable and safe TCMS PhAse 3

Project

CONNECTA-3 - CONtributing to Shift2Rail's NExt generation of high Capable and safe TCMS PhAse 3


Funding origin:
European
European Union
STRIA Roadmaps:
Vehicle design and manufacturing (VDM)
Vehicle design and manufacturing
Network and traffic management systems (NTM)
Network and traffic management systems
Transport mode:
Rail
Rail
Transport sectors:
Passenger transport
Passenger transport
Freight transport
Freight transport
Duration:
Start date: 01/12/2020,
End date: 01/07/2023

Status: Finished
Funding details:
Total cost:
€3 945 623
EU Contribution:
€3 945 623

Overview

Objectives:

Continuation project of CONNECTA-2 (GA 826098) which targets the high TRL deployment and validation in two relevant laboratory demonstrators and field tests for urban and regional scenarios of the following technologies:

  • Wireless TCMS, including wireless train backbone, wireless consist network and standardized train-to-ground according to IEC 61375-2-6.
  • NG-TCN including high safe (SIL4) communication networks to support the drive-by-data concept, including brake-by-wire.
  • Functional Open Coupling (FOC).
  • Functional Distribution Framework (FDF) instantiated with two different approaches (modified AUTOSAR and self implemented on top of specific operating system), together with relevant application profiles.
  • The virtual certification simulation framework, with hardware-in-the-loop and remote connectivity to subsystems.

The goal is to reach TRL 6/7 in most developments.