Crossing railway / road (VSS1999/111)
Funding origin:
Switzerland
STRIA Roadmaps:
Network and traffic management systems (NTM)
Transport infrastructure (INF)
Transport mode:
Multimodal
Project website:
Duration:
Start date: 01/05/1999,
End date: 01/12/2002
Status: Finished
Funding details:
Overview
Background & policy context:
A great number of the existent level crossings in the 5000 km railway network cannot be replaced by non-level crossings for economic reasons and for maintaining proportionality.
Actually solutions for level crossing protection have been developed which respect the limited financial means and try to optimise the impact on road traffic flow. Basic structures which respect all aspects do not exist. The research wants to fill this gap.
Objectives:
The aim is to develop basic structure and create a standard.