Development of a 1435 mm standard gauge railway line in the Rail Baltic/Rail Baltica (RB) corridor through Estonia, Latvia and Lithuania (Part II)

Project

Development of a 1435 mm standard gauge railway line in the Rail Baltic/Rail Baltica (RB) corridor through Estonia, Latvia and Lithuania (Part II)


Funding origin:
Estonia
Estonia
Funding sources:
RB Rail A.S.
STRIA Roadmaps:
Transport infrastructure (INF)
Transport infrastructure
Transport mode:
Rail
Rail
Transport sectors:
Passenger transport
Passenger transport
Freight transport
Freight transport
Duration:
Start date: 01/02/2016,
End date: 01/12/2020

Status: Finished
Funding details:

Overview

Background & policy context:

The action is the second phase of the pre-identified, cross-border "Rail Baltic/Rail Baltica" (RB) project connecting the three Baltic States with Central Europe along the North Sea–Baltic Corridor.

Objectives:

The aim of the Global Project "Rail Baltic/Rail Baltica" (Tallinn-Riga-Kaunas-Warsaw axis) is to develop a new, EU gauge double-track electrified railway line to eliminate the technical bottleneck due to the gauge differences (1520 mm vs. EU 1435 mm).

The aim of this Action is to further implement all the necessary preparatory activities, to continue with the construction works and to prepare for the main construction phases of the railway line.