EBEK - Development and assessment of rail-based disposal chains for rural areas
Overview
Objectives:
The aim of the research project “Development and assessment of rail-based disposal chains for rural areas, EBEK” is the development of a concept for a rail transport-based disposal chain for urban waste of the example region "Alb-Donau", which uses the regional infrastructure for waste processing and recycling. The aim is to achieve the lowest possible environmental impact under consideration of the necessary waste transports and taking commercial requirements into account. A further component of the project is the investigation of existing and future e-business trading platforms specifically for the trade of waste and recyclable materials.
The investigation is designed to identify synergies with other logistics systems and to identify ways to improve the use of logistical infrastructure and to achieve an improvement over the current situation, taking into account environmental goals and operational requirements.
Methodology:
The example region "Alb-Donau" is formed by the six Baden-Württemberg regions Biberach, Reutlingen, Sigmaringen, Tübingen, Tuttlingen and Zollernalbkreis.
The starting point for the investigation is provided by the Technical Instructions for the Settlement of Waste (TASI, 1993). As a consequence, since 2005 no more wastes with a loss on ignition of more than five percent may be deposited. This means, in the current state of the art, that the waste must be thermally pretreated. Since the sample region itself does not have its own facilities for this, the necessary traffic volume in waste disposal will rise sharply in 2005.
As a basis for the determination of cooperation potentials and for the later dimensioning of the demonstrators, it is necessary to have a detailed knowledge of the waste volumes in the example region "Alb-Donau". For this purpose, the structure of waste disposal is examined in a first step. This includes the identification of the different waste management companies operating in the example region and their contractual basis. This is followed by a description of today's waste collection, which is carried out for the different districts for the residual and bulky waste at different waste disposal sites. An investigation of the cost structures and an outlook on the future development of waste disposal in the example region round off the analysis of waste disposal in the example region.
Based on this analysis, a description of possible cooperation areas and cooperation partners within the example region will be given.
Taking into account the identified possibilities for cooperation, two demonstrators are defined as working hypotheses:
- Demonstrator 1 describes a joint transport of household waste, bulky waste and publicly collected commercial waste from the counties of Zollernalbkreis, Tübingen and Reutlingen to the waste incineration plant to Stuttgart-Münster. In doing so, the transport chain “truck transport – rail transport – truck transport” is examined.
- The demonstrator 2 considers the railway transport of household waste, bulky waste and publicly collected commercial waste from the counties of Tuttlingen and Sigmaringen to the waste incineration plant TAD Ulm. Here too, the transport chain “truck transport – rail transport – truck transport” is examined.
Share this page