Skip to main content
European Commission logo
TRIMIS

E-Bridge

Project

E-Bridge


Funding origin:
European
European Union
STRIA Roadmaps:
Transport infrastructure (INF)
Transport infrastructure
Transport mode:
Multimodal
Multimodal
Transport sectors:
Passenger transport
Passenger transport
Freight transport
Freight transport
Project website:
Duration:
Start date: 01/10/2018,
End date: 01/10/2021

Status: Finished
Funding details:
Total cost:
€12 185 050
EU Contribution:
€6 092 525

Overview

Background & policy context:

The Action is located in the Western Ligurian Sea port system (Ports of Genoa and Savona/Vado) on the Rhine-Alpine Core Network Corridor. 

Objectives:

It is part of Global Project aiming at enhancing the interoperability of transport services to ensure a sustainable and efficient transport system and to optimise the integration of transport modes.

In the long run, the Action will improve road accessibility to the ports by reducing the gate-in gate-out average time in the peak hours from 60 to 40 minutes. It will also increase the port rail potential by 30% additional trains on a yearly basis and it will increase the ports’ capacity by 500,000 TEUs/year.

Methodology:

The E-Bridge (Emergency and BRoad Information Development for the Western Ligurian Sea port system) consists of a series of studies and pilots to develop a set of 3 innovative modules:

  • Smart port and inland buffer area management;
  • Innovative digital last mile rail;
  • An advanced road gates system.

These modules will be fully interoperable with the existing systems.

 

Contribute! Submit your project

Do you wish to submit a project or a programme? Head over to the Contribute page, login and follow the process!

Submit