Project
DRM-Infra - Exploration of permanent pavement markings with increased resistance against mechanical stress in winter
Funding origin:
Austria
STRIA Roadmaps:
Transport infrastructure (INF)
Transport mode:
Road
Transport sectors:
Passenger transport
Freight transport
Duration:
Start date: 01/06/2015,
End date: 01/03/2018
Status: Finished
Funding details:
Overview
Objectives:
The scope of this project includes the development of a road marking-system that steadily maintains its properties with regard to traffic (visibility during day and night, drainage capability as well as skid resistance) despite the increased stress during the winter period. This shall be developed via a multi-stage procedure including laboratory and field studies. The approach includes a geometric modification of the shape and the characteristics of the marking-system whilst taking into consideration the technical feasibility.
Share this page