Skip to main content
European Commission logo
TRIMIS

FAMOS Odin: Finalising Surveys for the Baltic Motorways of the Sea

Project

FAMOS Odin: Finalising Surveys for the Baltic Motorways of the Sea


Funding origin:
Estonia
Estonia
Funding sources:
Swedish Maritime Administration
STRIA Roadmaps:
Network and traffic management systems (NTM)
Network and traffic management systems
Transport mode:
Waterborne
Waterborne
Transport sectors:
Passenger transport
Passenger transport
Freight transport
Freight transport
Duration:
Start date: 01/02/2016,
End date: 01/12/2018

Status: Finished
Funding details:

Overview

Background & policy context:

The action is the second of three actions comprising the Global Project. The Global Project aims to complete hydrographic surveying in an area of approximately 26.000 km² of the Baltic Sea according to the BSHC-HELCOM Scheme, thereby supporting sustainable and safe shipping in the Baltic Sea and contributing to Blue Growth in the region. The planned hydrographic surveys will also provide information that can be used for navigating vessels on routes with maximised water depth, optimising fuel efficiency and reducing the impact on environment.

Objectives:

The overall objective of this wider benefit MoS Action is to implement the second stage of the finalisation of hydrographic surveying of the Baltic Sea according to the BSHC-HELCOM Scheme. The Action will specifically:

  • Objective 1: Increase safety of navigation in the Baltic Sea through hydrographic surveying of additional approx. 26 000 km² of areas which have been identified as important for shipping activities.
  • Objective 2: Update nautical products such as charts and Electronic Navigation Charts (ENC), based on the survey data produced.
  • Objective 3: Produce bathymetry base data for future navigation applications, such as Sea Traffic Management or the next generation of Electronic Chart Display & Information System (ECDIS).
  • Objective 4: Optimisation of vessel positioning accuracy by improving the marine geodetic infrastructure. This includes work towards a highly accurate and quality controlled geoid model with the objective to complete it in 2020, as well as recommendations towards better GNSS augmentation systems.
  • Objective 5: Re-calculate vertical datum dependent chart data, such as charted soundings, depth contours or bridge clearings, and issue updated nautical products based on EVRS realisations.