Innovative railway sleeper design increasing track lateral resistance, reducing significantly costs related to track misalignment events

PROJECTS
Funding
European
European Union
Duration
-
Status
Complete
Geo-spatial type
Other
Total project cost
€1 938 094
EU Contribution
€1 356 657
Project Acronym
DINTRA
STRIA Roadmaps
Vehicle design and manufacturing (VDM)
Transport mode
Rail icon
Transport policies
Societal/Economic issues,
Safety/Security
Transport sectors
Passenger transport,
Freight transport

Overview

Call for proposal
H2020-SMEINST-2-2016-2017
Link to CORDIS
Background & Policy context

Railway track lateral movement occurs when lateral resistance is not enough hold track in place. This movement is known as track misalignment (when it is a progressive defect associated to train loads) or track buckle (when it is an abrupt event associated mainly to unusually high temperatures). Track alignment must be restored as even small track misalignments induce additional dynamic forces in the vehicle.

Track maintenance operations to restore track alignment (tamping) require 26% of track maintenance and renewal cost (2.989M€/year in Europe). Besides, cost of rail grinding and renewal operations are estimated to be around 10% of total EU railway maintenance and renewal costs (1.118M€/year).

Moreover, track misalignment eventually causes a great risk of derailment. It is estimated that around 25% of train derailments are due to track geometry deterioration, causing on average 18 derailments per year in Europe with an associated economic loss of 32M€, not considering the potential human losses.

Objectives

To solve this situation, ACCISA has developed DINTRA sleepers, an innovative solution capable of increasing significantly lateral track resistance. Reduction of track maintenance and renewal cost and track buckle events and derailments due to track misalignment will be experienced. DINTRA sleepers have a low implementation cost and no need for extra calculation or new equipment for their implementation.

Our overall objective with the present project is to industrialize the production process of DINTRA sleeper to introduce them into the international market through the construction of three advanced demonstration element in the most complex and demanding conditions.

When implementing DINTRA sleepers, railway infrastructure managers will save over 978M€ in track maintenance and renewal cost during the lifespan of the product (40 years), while only investing 53.7M€. DINTRA sleepers will lead to 13.7M€ of benefits for ACCISA by the 5th year.

Funding

Parent Programmes
Institution Type
Public institution
Institution Name
European Commission
Type of funding
Public (EU)
Specific funding programme
H2020-EU.3.4.
H2020-EU.2.1.1.
H2020-EU.2.3.1.

Partners

Lead Organisation
Organisation
Agrupacion Cantabra De Construccion E Ingenieria Sa
Address
POLIGONO INDUSTRIAL DE BARROS, C/ALFONSO ALVAREZ MIRANDA N 11 C, 39408 LOS CORRALES DE BUELNA, Spain
EU Contribution
€1 356 657
Partner Organisations
EU Contribution
€0

Technologies

Technology Theme
Infrastructure management
Technology
Track improvements for higher reliability and reduced maintenance
Development phase
Demonstration/prototyping/Pilot Production

Contribute! Submit your project