MAke RAil The HOpe for protecting Nature 2 future OPERATION

PROJECTS
Funding
European
European Union
Duration
-
Status
Complete
Geo-spatial type
Network corridors
Total project cost
€599 955
EU Contribution
€599 955
Project Acronym
MARATHON2OPERATION - M2O
STRIA Roadmaps
Network and traffic management systems (NTM)
Transport mode
Rail icon
Transport policies
Safety/Security
Transport sectors
Passenger transport,
Freight transport

Overview

Link to CORDIS
Objectives

The MARATHON2OPERATION (M2O) project has the following objectives: 

  • To deliver a reliable communication solution based on GSM-R to transfer orders and information to and from the Driver of the master locomotive to the unmanned traction unit(s) present in the train to provide distributed traction with one to four traction units, only one being manned and the other(s) remote controlled, with 1500m as a maximum length of the train. This communication solution should be compatible with various types of locomotives.
  • To fulfil safety requirements at the reception end situated at the entrance of the interface with the command panel of each of the remote-controlled traction unit.
  • To integrate the GSM-R radio technology with the interface of the Traction Unit (TU) and the Distributed Power System (DPS). This topic will be the target of a hazard analysis to define backup solutions using transmission of braking orders via the brake pipe, or operational procedures to ensure the safety of the train.
  • To simulate the in-train forces with the use of TrainDy software with the various distributed traction configurations, various load distributions, various types of wagons and with a maximum length of 1500m. The target is to define safe configurations in terms of speed limit, wagon quality and acceptable payload (global and distribution) to operate and react safely in all possible operational situations.
  • To prepare, in alignment with the partners of the S2R-CFM-IP5-01-2018 project, the safety and certification-related (TRL5) part necessary for the running of two test trains in 2019 and 2020, as requested by call text.
  • This project is aligned with the objectives assigned by the European Commission in the last white paper to have 30% of road traffic on rail by 2030. To reach that goal a massive increase of rail freight transport is necessary while the infrastructure necessary for such an increase with classical trains will take a much longer time to be decided, financed and built. Enhancing the existing infrastructure capacity is a must while increasing at the same time the rail freight transport competitiveness. ERTMS, necessary for a smooth border crossing between Member States, which is slowly developing has such an ambition while increasing the safety but, due to high retrofitting costs of existing long-life traction units, penalizes the rail freight transport competitiveness. Building on previous projects results this project intends for new configurations using GSM-R and multi locomotives distributed traction to allow, jointly with the S2R-CFM-IP5-01-2018 project to be launched, to perform tests with a 740m train and a 1500m train with distributed traction. This project when implemented will allow a gain up to 40% capacity per ton transported compared to the present control command situation or even 16% capacity gain per ton transported when ERTMS level 3 would be implemented. This project is a way to use the existing infrastructure capacity at its best in the short term with marginal investments, while enhancing the rail freight transport competitiveness up to 30% in comparison with the classical existing freight trains at their optimal use.
  • To give to the users a reliable communication solution largely usable based on a widely spread safe GSM-R network and a table giving guidelines for constituting such trains safely as regard speeds, type of wagons, load distribution in the trains, driving behaviour, operational rules and type of distributed traction in relation with classical route configurations (curves, gradients).
  • To widely disseminate the results to obtain a significant positive impact on the environment and a progress of knowledge in this field.

Funding

Parent Programmes
Type of funding
Public (EU)

Partners

Lead Organisation
Organisation
Università Degli Studi Di Roma "tor Vergata"
Address
Via Orazio Raimondo 18, 173 ROMA, Italy
Organisation website
Partner Organisations
Organisation
Union International Des Chemins De Fer
Address
16 rue Jean Rey, 75015 PARIS, France
Organisation website
EU Contribution
€21 469
Organisation
Funkwerk Systems Gmbh
Address
IM FUNKWERK 5, 99625 KOLLEDA, Germany
EU Contribution
€60 313
Organisation
Nier Ingegneria Spa
Address
VIA CLODOVEO BONAZZI 2, 40013 CASTEL MAGGIORE (BO), Italy
Organisation website
EU Contribution
€122 271
Organisation
Tuv Sud Rail Gmbh
Address
BARTHSTR. 16, 80339 MUNCHEN, Germany
EU Contribution
€21 541 949
Organisation
Tuv Sud Rail Gmbh
Address
BARTHSTR. 16, 80339 MUNCHEN, Germany
EU Contribution
€76 963
Organisation
New Opera Aisbl
Address
Rue D'idalie, 1050 Brussels, Belgium
EU Contribution
€144 513

Technologies

Technology Theme
Satellite navigation
Technology
EGNSS application on railway to assist ERTMS and ETCS systems
Development phase
Research/Invention