Multifunctional automation system for Fuselage Assembly Line

MultiFAL

Multifunctional automation system for Fuselage Assembly Line

Call for proposal: 
H2020-CS2-CFP07-2017-02
Link to CORDIS:
Objectives: 

The main objective of MultiFAL project is to design, develop and construct an automated plant system for joining thermoplastic fuselage shells considering three different design use-cases, taking into account the existing assembly plant system at the topic managers’ facility.

MultiFAL will consider automation and virtual commissioning technologies in order to bring both an increase in the assembly process performance and a deep understanding of the relevant factors implementing a full-size automated plant following a brownfield approach.

Different assembly approaches and joining process for different use-cases will be considered, taking into account the currently existing double-sided and limited accessibility for full fuselage sections.

As a result, MultiFAL will also facilitate the adaptability of both the robotic machinery and the central control system. Objectives include reducing the commissioning time of automated plant systems up to 20% by the use of virtual commissioning tools, increasing the level of detail for production steps around 25% by implementing interfaces between plant system and production control. Additionally, usability and re-utilization of automation systems by development and implementation of standardized interfaces will be enhanced. In the MultiFAL project, lean development approaches will be combined with agile methodologies to develop not only software modules for the simulation but also for the virtual commissioning of the plant system.

Moreover, following results will be achieved:

  • End-to-End design approach exploiting model-based system-engineering methodologies
  • Flexible automated plant system enabling multi use-case coverage
Institution Type:
Institution Name: 
European Commission
Type of funding:
Programme Other: 
JTI-CS2-2017-CfP07-LPA-02-22 Development of a full size automated plant system for fuselage longitudinal and circumferential joints
Lead Organisation: 

Ct Ingenieros Aeronauticos De Automocion E Industriales Sl

Address: 
AVENIDA LEONARDO DA VINCI 22 PARQUE EMPRESARIAL LA CARPETANIA LA ATALAYUELA
28906 GETAFE (MADRID)
Spain
EU Contribution: 
€665,350
Partner Organisations: 

Fft Produktionssysteme Gmbh & Co. Kg

Address: 
SCHLEYERSTRASSE 1
36041 FULDA
Germany
EU Contribution: 
€1,644,587

Asociacion De Investigacion Metalurgica Del Noroeste

Address: 
Calle Relva Torneiros 27A
36410 Porrino
Spain
EU Contribution: 
€189,735
Technologies: 
Development phase: