Skip to main content
European Commission logo
TRIMIS

Programme for calculating longitudinal dynamics in freight trains

Project

Traindy Programme - Programme for calculating longitudinal dynamics in freight trains


Funding origin:
International
STRIA Roadmaps:
Network and traffic management systems (NTM)
Network and traffic management systems
Transport mode:
Rail
Rail
Transport sectors:
Freight transport
Freight transport
Project website:
Duration:
Start date: 01/11/2007,
End date: 01/09/2008

Status: Finished
Funding details:

Overview

Background & policy context:

Against a background of increasing trade, greater road congestion, high oil prices and growing concerns about environmental conservation, rail freight transport offers genuine advantages and is continuing to expand. In this context, the UIC has clearly identified the existence of substantial demand for international freight trains with an overall tonnage of more than 1200 tonnes.

Project TrainDy is a major step towards harmonisation of international freight traffic improving freight train performance and efficiency. 

Project TrainDy is a key building block in international freight traffic harmonisation, increasing international freight train performance whilst ensuring a high level of safety.

Objectives:

The purpose of the project is a development and commercialisation of a software system needed for calculation of longitudinal dynamic forces for freight trains.

This software tool  has been specially developed to simulate pneumatic effects and longitudinal forces which should lead to greater unification of international braking modes facilitating the operation of trains in international traffic. This means that the performance of freight trains is increased whilst ensuring that current levels of safety are maintained.

Methodology:

The project was worked out in three steps:

  1. The first step is for the system to respond to the present demand of the railways supporting its development
  2. The second step is to develop the legal framework which will allow other users and promoters to access this system
  3. The third step is to make the system available for other users

The first step is divided into three phases of verification carried out by UIC:

  • Determine the requirements to be met in simulation by pneumatic (brake pipes, distributors, etc.) and dynamic (buffers, coupling hooks, suspension springs, etc.) components.
  • Incorporate input data as well as potential optimisations of individual functions into the programme.
  • Validate the entire TrainDy system on the basis of the pneumatic and dynamic components to be replicated. The UIC-approved version of the programme should thus be available by late 2008.

In the medium term TrainDy should not only be able to calculate longitudinal dynamics for the European market, but also for the railways of Asia, North and South America, Africa and Oceania, and their specific equipment.

The long term prospect is to implement a complete three-dimensional model for rolling stock, with pantograph and wheel/rail interfaces.

This implies investigating the interaction between wheel and rail, in order better to understand the forces arising between the two and the resulting train behaviour, for example in the case of reduced friction in autumn. In addition, the vertical forces in freight wagons must be taken into account in order to predict abnormal wear of components.