Research of necessary operating parameters of prospective temporary bridges for rail transport

PROJECTS
Funding
Czechia
Czechia
Duration
-
Status
Complete with results
Geo-spatial type
Other
STRIA Roadmaps
Infrastructure (INF)
Transport mode
Rail icon
Transport sectors
Passenger transport,
Freight transport

Overview

Objectives

The project determines and objectifies the parameters of temporary bridge structures to deal with rapid restoration of railway bridges on the upgraded double-track railway and corridors discarded due to emergencies such as floods and big accidents. The applicability of the identified parameters is verified by conceptual design of future temporary bridge construction, accelerating the restoration of transport services on railway and by experimental verification of key details of the structure.

Funding

Parent Programmes
Institution Type
Research agency
Institution Name
The Technology Agency of the Czech Republic
Type of funding
Public (national/regional/local)
Funding Source
Technology agency of the Czech Republic

Results

  • The main output of the project are guidelines for determining the parameters of a temporary bridge structure suitable for the use on upgraded lines and corridors - the guidelines establishe and objectify the parameters of new temporary bridge structures for dealing with the fast recovery of railway bridges on upgraded double-track lines and railway corridors excluded due to crisis situations caused by floods or any major disasters. The methodology uses scientific methods such as analysis and synthesis in examining the needs of a future user, prospective investors and statistics on a railway infrastructure. The applicability of the identified parameters has been verified by the conceptual design of the perspective temporary bridge construction which accelerate the restoration of transport services on railways and by experimental verification of structural key details.
  • The shear connection on a flange (utility model) - the aim of the technical solution is to eliminate the deficiencies of shear connections on the flanges, especially of steel beams. We can achieve this requirement for shear connection of flanges, especially of steel beams, by using this technical solution. The essence of the solution is the rigid elastic rubber inserted between the adjacent walls of shear trigs on upper and lower flange.
  • The flange connection used for I beams (utility model) - the aim of the technical solution is to eliminate the deficiencies of the existing flange connections of the beams as far as possible and to lower the number of screws used for such connections and thereby simplify the mounting. We can achieve these requirements by using the flange connection of the beams according to this solution. The connection consists of heads fixed on the connected flanges and stirrups stung on both sides of the heads.

Partners

Lead Organisation
EU Contribution
€0
Partner Organisations
EU Contribution
€0

Technologies

Contribute! Submit your project

Do you wish to submit a project or a programme? Head over to the Contribute page, login and follow the process!

Submit