Skip to main content
European Commission logo
TRIMIS

Upgrading of the Poljčane-Slovenska Bistrica railway line

Project

Upgrading of the Poljčane-Slovenska Bistrica railway line


Funding origin:
Slovenia
Slovenia
Funding sources:
Ministry of Infrastructure
STRIA Roadmaps:
Network and traffic management systems (NTM)
Network and traffic management systems
Transport infrastructure (INF)
Transport infrastructure
Transport mode:
Rail
Rail
Transport sectors:
Passenger transport
Passenger transport
Freight transport
Freight transport
Duration:
Start date: 01/05/2015,
End date: 01/03/2018

Status: Finished
Funding details:

Overview

Background & policy context:

The Slovenian railway line "Celje-Pragersko" is located on the Baltic-Adriatic and Mediterranean Core Network Corridors. The line currently represents a bottleneck in passenger and freight transport due to insufficient load capacity and limited interoperability.

Objectives:

The Action concerns construction works for upgrading of the "Poljčane-Slovenska Bistrica" double-track section with the main objective to increase the load capacity and improve the interoperability of the railway line.

Methodology:

The Action concerns construction works in the Poljčane station, the Poljčane–Slovenska Bistrica section and the Slovenska Bistrica station. The works cover reconstruction of substructure and superstructure, construction of platforms, grade-separated crossings, underpasses, as well as adjustments of energy, signalling-safety and telecommunication devices.

Contribute! Submit your project

Do you wish to submit a project or a programme? Head over to the Contribute page, login and follow the process!

Submit