Sorry, you need to enable JavaScript to visit this website.
An official website of the European UnionAn official EU website
English (en)
TRIMIS

Search

Search results (Number of results found: 18)

  1. Duration: Jan 2014 - Dec 2022
    Status: Ongoing

    BACA The annual air pollutant emission inventory should cover all sources, as well as all pollutants for which methodologies are provided in the latest version of the EMEP/EEA air pollutant emission inventory guidebook. This goal will be achieved by the p ...

    Flag of Lithuania Lithuania
  2. Duration: Jan 2004 - Dec 2006
    Status: Complete

    The Programme Document is an accompanying document to the Single Programming Document (SPD) of Lithuania for 2004-2006, as provided by Article 18 of the General Regulation on Structural Funds (1260/99). At the present juncture it is still a draft, because ...

    Flag of Lithuania Lithuania
  3. Duration: Mar 2016 - Jun 2018
    Status: Complete

    2015-LT-TM-0160-W The whole project is driven by the need of support for new operational concepts and technical capabilities at national, Baltic FAB (Functional Airspace Block Lithuania-Poland) and international/EU levels.   This Action will complement th ...

    Flag of Lithuania Lithuania
  4. Duration: Jan 2013 - Dec 2028
    Status: Ongoing

    Main traffic artery between Vilnius and north-eastern Lithuanian regions. In 2013: 4,469 –5,742 vehicles Maximum registered daily traffic volumes on 28.97 km on 2 August 2013 (Friday): 10,389 vehicles (238 heavy vehicles) In 2028: up to 7,000 vehicles. Fa ...

    Flag of Lithuania Lithuania
  5. Duration: Jun 2004 - Oct 2008
    Status: Complete

    Additional TEN-T links make the important part of Lithuanian road network. They join the European transport corridors and also serve as transit roads. Due to the lack of funds the mentioned roads in the last decade have been developed episodically, paying ...

    Flag of Lithuania Lithuania
  6. Duration: Jun 2004 - Jul 2008
    Status: Complete

    Main roads are the roads of international communication in Lithuania. Though there are still (many) sections falling behind the requirements for international roads.  The main objective of this project – to reconstruct these sections and to ensure safe an ...

    Flag of Lithuania Lithuania
  7. Duration: Jun 2004 - Jul 2007
    Status: Complete

    VIA BALTICA International corridors are the most important part of Lithuanian road network. Though there are still (many) sections falling behind the requirements for transport corridors. The main objectives of this project are to reconstruct these sectio ...

    Flag of Lithuania Lithuania
  8. Duration: Jun 2004 - Dec 2010
    Status: Complete

    International corridors are the most important part of Lithuanian road network. Though there are still (many) sections falling behind the requirements for transport corridors. The main objective of this project is to reconstruct these sections and to ensu ...

    Flag of Lithuania Lithuania
  9. Duration: Sep 2007 - Mar 2010
    Status: Complete

    The project is financed from the European Union Structural Assistance funds 2007–2013 according to the Economic Growth Action Plan Priority 5 “Development of Trans-European Transport Networks“instrument VP2-5.1-SM-01-V “Enhancement of the Permeability of ...

    Flag of Lithuania Lithuania
  10. Duration: Nov 2008 - Nov 2010
    Status: Complete

    The project is financed from the European Union Structural Assistance funds 2007–2013 according to the Economic Growth Action Plan Priority 5 “Development of Trans-European Transport Networks“ instrument VP2-5.1-SM-01-V “Enhancement of the Permeability of ...

    Flag of Lithuania Lithuania
  11. Duration: Oct 2007 - Mar 2010
    Status: Complete

    The project is financed from the European Union Structural Assistance funds 2007–2013 according to the Economic Growth Action Plan Priority 5 Development of Trans-European Transport Networks instrument VP2-5.1-SM-01-V Enhancement of the Permeability of Tr ...

    Flag of Lithuania Lithuania
  12. Duration: Mar 2010 - Dec 2011
    Status: Complete

    The project is financed from the European Union Structural Assistance funds 2007–2013 according to the Economic Growth Action Plan Priority 5 "Development of Trans-European Transport Networks"  instrument VP2-5.1-SM-01-V "Enhancement of the ...

    Flag of Lithuania Lithuania
  13. Duration: Dec 2011 - Dec 2012
    Status: Complete

    The Project Reconstruction of Road E85 (Vilnius–Lida) of the Trans-European Road Network will be implemented under the 5th Priority Development of Trans-European Transport Network (Measure VP2-5.1-SM-01-V Improvement of the Capacity and Technical Paramete ...

    Flag of Lithuania Lithuania
  14. Duration: Aug 2013 - Apr 2014
    Status: Complete

    The Project Reconstruction of Road E28 (Vilnius–Minsk) of the Trans-European Road Network will be implemented under the 5th Priority Development of Trans-European Transport Network (Measure VP2-5.1-SM-01-V Improvement of the Capacity and Technical Paramet ...

    Flag of Lithuania Lithuania
  15. Duration: Jul 2015 - Dec 2020
    Status: Complete

    The Rail Baltic/Rail Baltica project Warsaw-Kaunas-Riga-Tallinn-Helsinki is a pre-identified section of the North Sea-Baltic Core Network Corridor. It has the goal to develop high-quality connections for passenger and freight transport between Finland, th ...

    Flag of Lithuania Lithuania
  16. Duration: Jan 2015 - Dec 2020
    Status: Complete

    The action aims at finalising the organisational, technical and operational conditions of a fully functional Rail Freight Corridor North Sea-Baltic in line with Regulation 913/2010, and covers the preparation of the extension to Latvia and Estonia. AB &qu ...

    Flag of Lithuania Lithuania
  17. Project
    Duration: Jul 2015 - Dec 2020
    Status: Complete

    ITS for Road has been applied by EU Member States with great success since decades as a necessary mean to alleviate problems caused by an increasing demand for road transport while using the existing infrastructures. Ensuring continuity of high quality IT ...

    Flag of Lithuania Lithuania
  18. Duration: Jan 2015 - Dec 2017
    Status: Complete

    This action is the second phase of the Global Project, aiming at developing a Liquefied Natural Gas network within the Baltic Sea region so as to create a viable and alternative fuel source for vessels. This wider benefit MoS action encompasses physical i ...

    Flag of Lithuania Lithuania