Sorry, you need to enable JavaScript to visit this website.
An official website of the European UnionAn official EU website
English (en)
TRIMIS

Search

Search results (Number of results found: 54)

  1. Duration: Jan 2013 - Dec 2015
    Status: Complete with results

    ENERBAR The project includes the material-construction-technological development of energy-absorbing overlays on steel barriers class B / SP05, with N2 / B / W3 protection parameters.   The energy-absorbing layers are used in the overlays: composite (poly ...

    Flag of Poland Poland
  2. Duration: Mar 2012 - Feb 2014
    Status: Complete with results

    The aim of the project is to develop a combined system for protecting people in vehicles.  The current car seat important aspects- construction (strength), comfort, ergonomics and safety- were tested separately. This approach lead to a total consideration ...

    Flag of Poland Poland
  3. Duration: Mar 2002 - Dec 2004
    Status: Complete with results

    The process of the aircraft traffic service at the airport constitutes one of the most vital aspects of air traffic management at the airport. Due to the fact that it seems extremely difficult, if not impossible, to examine all phenomena taking place in t ...

    Flag of Poland Poland
  4. Duration: Aug 2001 - Jun 2004
    Status: Complete with results

    “Bimodal” trains are a part of the well known combined, rail-road transportation system. The advantage of the bimodal idea is that this method of transportation completely eliminates vertical movements of loading units during terminal operations. Loading ...

    Flag of Poland Poland
  5. Duration: Jul 2014 - Dec 2016
    Status: Complete with results

    LABIM There was detected a need to ensure the safety of traffic by the improved horizontal geometry of the surface. The idea of a new waterproofing solution based on the concept of using channels in the insulating roof paper, which, however, does not corr ...

    Flag of Poland Poland
  6. Duration: Dec 2015 - Dec 2018
    Status: Complete

    The objective of the project is to develop a directory of vehicles and to prepare modification of the documentation for their standardization and to allow the installation of communications equipment and ICT adapted for this purpose. Utworzenie klasyfikac ...

    Flag of Poland Poland
  7. Duration: Jan 2013 - Dec 2014
    Status: Complete with results

    The purpose of the project is to build a floating platform to evacuate people from the floodplain. The platform will allow analysis of the suitability of the adopted concept of evacuation from flood areas. The analysis concerns both the physical model and ...

    Flag of Poland Poland
  8. Duration: Jan 2015 - Sep 2015
    Status: Complete with results

    Pedestrian traffic plays an important role in the transport system. This applies both to small towns and villages where there is no public transport developed  and the downtown areas in large cities, where short trips are a very common way of movement in ...

    Flag of Poland Poland
  9. Duration: Apr 2007 - Jun 2015
    Status: Complete with results

    The strategic objective of the project is to implement the first stage of improving the functionality of urban transport by improving access to the central areas of the city and ensuring efficient transport within the city of  Rzeszów, which will contribu ...

    Flag of Poland Poland
  10. Duration: Jan 2014 - Jun 2014
    Status: Complete with results

    The main objective of the project is to improve the quality of public transport services operated by the public transport operator- Plock Sp. z o.o.  with a high level of security of urban transport. Implementation of the project contributes to change of ...

    Flag of Poland Poland
  11. Duration: Jan 2016 - Dec 2017
    Status: Complete

    Every trip, whether it is cariied out by using a car, bicycle or public transport, the journey begins walking. Therefore, the most important projects are road infrastructure projects which provide an adequate state of infrastructure for pedestrians.  Its ...

    Flag of Poland Poland
  12. Duration: Jan 2013 - Dec 2015
    Status: Complete with results

    (AMC-2) The subject of the AMC-2 project was to develop a comprehensive mobility support system for the mobility impaired, with an adapted pilot fleet for the needs of nine types of motor dysfunction (including motion and spine). Adaptations were made to ...

    Flag of Poland Poland
  13. Duration: Jan 2012 - Jun 2015
    Status: Complete with results

    MOBIS About 30% of pedestrian victims of road accidents in Poland are hit on marked pedestrian crossings.  The aim of this project is to develop and test a method of assessing safety of pedestrian road crossings using automatic video image analysis.  It i ...

    Flag of Poland Poland
  14. Duration: 2007 - 2013

    Under the Decision of 7 December 2007 the European Commission approved the Operational Programme Infrastructure and Environment 2007-2013. It is a culmination of many months of work on preparing the largest programme in the history of the European Union. ...

    Flag of Poland Poland
  15. Duration: Jan 2015 - Jan 2016
    Status: Complete with results

    Since one of the main tasks of road administration is to carry out activities improving the functioning of road infrastructure in order to improve traffic safety, traffic managers are interested in managing road infrastructure safety. Road infrastructure ...

    Flag of Poland Poland
  16. Duration: Oct 2010 - Sep 2012
    Status: Complete with results

    The aim of the project is to gain the necessary knowledge and implement the system modules, enabling the performance of complex tasks of managing the operation of the road surface. The system includes a series of processes and tasks, the fulfilment of whi ...

    Flag of Poland Poland
  17. Duration: Jan 2016 - Dec 2016
    Status: Complete with results

    In the framework of this project arise recommendations on methods and best practices in the field of building of relationships with stakeholders, in order to achieve a consensus for the implementation of infrastructure plans and to minimize the risks asso ...

    Flag of Poland Poland
  18. Duration: Mar 2013 - Dec 2015
    Status: Complete with results

    MOPMO The project will be a new monitoring service bridge supports and their environment based on the measurement/flow of water and the amount of blur around the bottom of pillar. Managers of bridges will be able to improve significantly the safety of ope ...

    Flag of Poland Poland
  19. Duration: Apr 2010 - Apr 2013
    Status: Complete with results

    Construction of large objects in confined spaces, often in adverse ground conditions, as well as engineering of the road infrastructure will increase the unit load foundation. To reduce these problems, special pile foundation, additionally reinforced usin ...

    Flag of Poland Poland
  20. Project
    Duration: Jan 2013 - Dec 2015
    Status: Complete with results

    EYEVID project aims to develop tools to study the road infrastructure in terms of road safety (BRD).  The project will  develop a comprehensive set of tools to assess the security resulting from the lack of visibility or the visibility of the key elements ...

    Flag of Poland Poland

Pages