The New Rail Link through the Alps The New Rail Link through the Alps Project Duration December 2007 - December 2016 Status Complete STRIA Roadmaps Transport mode The New Rail Link through the Alps
DRIVE IN2 Methodologies, technologies and innovative systems of on-board Driver Monitoring for a safe and eco-friendly guide Project Duration January 2012 - January 2015 Status Complete with results STRIA Roadmaps DRIVE IN2
SVI 2014/009 Research Package VeSPA (Road safety gains resulting from datapooling and structured data analysis): Measures and potentials in the field of road infrastructure Project Duration January 2015 - October 2016 Status Complete STRIA Roadmaps Transport mode SVI 2014/009
SVI 2013/001 Temporal homogenisation of traffic network load - smoothing the traffic flow Project Duration June 2014 - August 2015 Status Complete with results STRIA Roadmaps Transport mode SVI 2013/001
Innovative solutions with synchronous machines in electric or hybrid vehicles for the improvement of performance and energy efficiency Project Duration January 2007 - January 2009 Status Complete with results STRIA Roadmaps Transport mode
Infrastructures for mobility and construction in metropolitan territory: guidelines for the integrated project Project Duration January 2006 - January 2008 Status Complete STRIA Roadmaps Transport mode
Applicability of porous asphalt on bridges of the national road network (AGB2004/002) Project Duration September 2005 - November 2009 Status Complete with results STRIA Roadmaps Transport mode
Guidelines for the competitiveness of Italian container-ports in the Euro-Mediterranean system: critical aspects and potential role of hub ports of Gioia Tauro, Cagliari and Taranto Project Duration January 2007 - January 2009 Status Complete with results STRIA Roadmaps Transport mode
BriViDi Diagnosis of railway bridges by dynamic analysis under train movement Project Duration January 2007 - January 2009 Status Complete with results STRIA Roadmaps Transport mode BriViDi
SIS-PRECODE Innovative systems for preventing corrosion and spoilage of vessel structures Project Duration June 2007 - December 2010 Status Complete with results STRIA Roadmaps Transport mode SIS-PRECODE