The New Rail Link through the Alps The New Rail Link through the Alps Project Duration December 2007 - December 2016 Status Complete STRIA Roadmaps Transport mode The New Rail Link through the Alps
Site Installation and Trials of the Acoustic Monitoring System Soundprint (AGB2002/009) Project Duration January 2004 - December 2007 Status Complete with results STRIA Roadmaps Transport mode
Ex-post analysis of the spatial impact of transport infrastructure: Vereina rail tunnel case study (04013) Project Duration April 2004 - December 2005 Status Complete with results STRIA Roadmaps Transport mode
Aircraft Piston Engine Emissions (2002-2) Project Duration September 2002 - December 2007 Status Complete with results STRIA Roadmaps Transport mode
Particle Sampling Project (PSP), (2009-1) Project Duration March 2009 - December 2011 Status Complete with results STRIA Roadmaps Transport mode
Impact of adverse weather conditions on pavement – Performance analysis in the case of temperature changes (ASTRA2009/004) Project Duration September 2009 - August 2013 Status Complete with results STRIA Roadmaps Transport mode
Noise reduced pavement for roads in cities. Tests – participation (ASTRA2008/007) Project Duration April 2008 - September 2008 Status Complete with results STRIA Roadmaps Transport mode
Weather Database for SHRP binder classification (VSS1997/045) Project Duration April 1997 - January 2003 Status Complete with results STRIA Roadmaps Transport mode
Adapting existing culverts for the use by terrestrial and aquatic fauna (VSS2003/603) Project Duration October 2005 - March 2008 Status Complete with results STRIA Roadmaps Transport mode
Comparison of noise characteristics of wearing courses with Mastic Asphalt (Gussasphalt) with designed surface (VSS2003/503) Project Duration September 2004 - December 2007 Status Complete with results STRIA Roadmaps Transport mode