Development of Road E67 (VIA BALTICA) of Transeuropean Road Network Project „Development of Road E67 (VIA BALTICA) of Transeuropean Road Network. Completion of Road Strengthening and Reconstruction of Marvele intersection“ The project is financed from the European Union Structural Assistance funds 2007–2013 according to the Economic Growth Action Plan Priority 5 “Development of Trans-European Transport Networks“ instrument VP2-5.1-SM-01-V “Enhancement of the Permeability of Trans-European Road Infrastructure. Improvement of Technical Parameters". I Transport Corridor (VIA BALTICA) cross the territory of Lithuania in the south-north direction connecting two posts of border crossing of Lithuanian Republic - Saločiai and Kalvarija. In the territory of Lithuanian Republic five main roads constitute the I Transport corridor: A10 Paneve˛ys–Pasvalys–Ryga, A17 Paneve˛ys bypass, A8 Paneve˛ys–Aristava–Sitkunai, A1 Vilnius–Kaunas–Klaipeda, A5 Kaunas–Marijampole–Suvalkai. This Corridor goes with European Road E67 and on the separate sections – with other Transport Corridors of all Europe: with Transport Corridor IXB - on the Road A1 section from 102,04 km to 114,54 km; with Transport Corridor IXD - on the Road A5 section from 0,0 km to 63,76 km; After completion of works in the period of years 2004-2006 on this transport corridor the number of sections, which did not correspond the requirements was reduced; however the main problem remains on the sections with still increasing traffic volume. After having evaluated possible alternatives and especially when traffic of freight vehicles is still on the increase an utmost attention in the stage of years 2007-2009 will be paid for reinforcement of roads’ cover and reconstruction of dangerous intersection. The main objectives of the project: - reconstruction and reinforcing of road cover, degraded due to the increased traffic volume; - implementation of missing traffic safety measures and reconstruction of the actual; - reconstruction of crossing which causes biggest problems; reduction of negative road impact upon the environment; Cost of project 93,358,000 LTL including: Cohesion Fund 62,4332,000 LTL Road Maintenance and Development programme 30,925,000 LTL Start date of Project 14 September 2007 End date of Project March 2010 The Project includes: - strengthening of road pavement – 27.33 km; - reconstruction of Marvele intersection – 1 unit; - construction of deceleration acceleration lane - 0.323 km; - construction of wire net fencing – 5.02 km; - construction of pedestrian – cycling paths – 2,99 km. Contracts of the Project Five contracts were signed. Contracts data Works Contract Contract No 1 (S-1195) Date of Contract signing 03 December 2007 Contractor AB Kauno tiltai Value of works carried out 45,630,657 LTL Date of completion 31 October 2008 Works Contract Additional Contract to Contract No 1 (S-1098) Date of Contract signing 26 August 2008 Contractor AB Kauno tiltai Value of works carried out 931,828 LTL Date of completion 31 October 2008 Works Contract Contract No 2 (S-1407) Date of Contract signing 10 December 2008 Contractor AB Kauno tiltai Value of works carried out 25,232,684 LTL Date of completion 15 November 2009 Works Contract Contract No 3, Lot I (S-235) Date of Contract signing 13 July 2009 Contractor AB Panevezio keliai Value of works carried out 6,395,870 LTL Date of completion 30 November 2009 Works Contract Contract No 3, Lot II (S-236) Date of Contract signing 13 July 2009 Contractor AB Panevezio keliai Value of works carried out 15,179,609 LTL Date of completion 30 November 2009 Updated 28-04-2010