Project
Modular system of bridge constructions made of advanced composite materials
Funding origin:
Czech Republic
STRIA Roadmaps:
Vehicle design and manufacturing (VDM)
Transport infrastructure (INF)
Transport mode:
Multimodal
Transport sectors:
Passenger transport
Freight transport
Project website:
Duration:
Start date: 01/01/2012,
End date: 01/12/2015
Status: Finished
Funding details:
Overview
Objectives:
The project deals with development of modular system of bridge constructions made of composites. These constructions will find the applicability as footbridges above roads or railways and between buildings, maintenance bridges, or temporary bridges in cases of natural disasters. The advantages of these constructions will be length variability, low weight, easy maintenance and prevention of corrosion and decay. A prototype of the bridge and methodology for design will be the results of the project.
Share this page