Skip to main content
European Commission logo
TRIMIS

Modular system of bridge constructions made of advanced composite materials

Project

Modular system of bridge constructions made of advanced composite materials


Funding origin:
Czech Republic
Czech Republic
STRIA Roadmaps:
Vehicle design and manufacturing (VDM)
Vehicle design and manufacturing
Transport infrastructure (INF)
Transport infrastructure
Transport mode:
Multimodal
Multimodal
Transport sectors:
Passenger transport
Passenger transport
Freight transport
Freight transport
Duration:
Start date: 01/01/2012,
End date: 01/12/2015

Status: Finished
Funding details:

Overview

Objectives:

The project deals with development of modular system of bridge constructions made of composites. These constructions will find the applicability as footbridges above roads or railways and between buildings, maintenance bridges, or temporary bridges in cases of natural disasters. The advantages of these constructions will be length variability, low weight, easy maintenance and prevention of corrosion and decay. A prototype of the bridge and methodology for design will be the results of the project.

Contribute! Submit your project

Do you wish to submit a project or a programme? Head over to the Contribute page, login and follow the process!

Submit