Skip to main content
European Commission logo
TRIMIS

multi-hAzard monitoring and earLy wARning systeM

Project

ALARM - multi-hAzard monitoring and earLy wARning systeM


Funding origin:
European
European Union
STRIA Roadmaps:
Network and traffic management systems (NTM)
Network and traffic management systems
Transport mode:
Airborne
Airbone
Transport sectors:
Passenger transport
Passenger transport
Freight transport
Freight transport
Duration:
Start date: 01/11/2020,
End date: 01/12/2022

Status: Finished
Funding details:
Total cost:
€991 269
EU Contribution:
€991 269

Overview

Objectives:

The overall objective of ALARM (“multi-hAzard monitoring and earLy wARning systeM” (ALARM) is to develop a prototype global multi-hazard monitoring and Early Warning System (EWS). A global multi-hazard monitoring means near-real time (NRT) and continuous global Earth observations from satellite, with the objective to generate prompt alerts of natural hazards affecting ATM and to provide information for enhancing situational awareness and providing resilience in crisis. 

Methodology:

NRT data (with delay of delivery from 10 min, to less than 4h) and tailored products from ground-based and satellite systems, will be used to feed models capable of detecting (creation of alert products) and predicting (nowcasting/forecasting) the risk/displacement of:

  • particles in suspension and gas derived from natural hazards (volcanic ash and SO2, dust clouds from sandstorms, and smoke from forest fire);
  • severe weather situations such as deep convection and extreme weather;
  • space weather regarding exposure to increased levels of radiation during flight;
  • environmental hotspots potentially contributing to global warming in a large extent.

ALARM EWS plans to provide alert information for the stakeholders about the threat to aviation in three different manners:

  • early warning (geolocation, altitude and level of severity -quantification if available- of the observed hazard);
  • for some cases nowcasting [up to 2h] and;
  • forecasting [from 2h to 48h] of hazard evolution at different flight levels.

The consortium will analyse the requirements for its inclusion in the yellow SWIM profile.

Specifically, the aim is to enhance situational awareness of all stakeholders in case of multiple hazard crisis by facilitating the transfer of required relevant information to end-users, presenting such information in a user-friendly manner to ATM stakeholders. In summary, anticipating severe hazards and fostering better decision-making.

Contribute! Submit your project

Do you wish to submit a project or a programme? Head over to the Contribute page, login and follow the process!

Submit