Project
Design of brigde edges (AGB1999/161)
Funding origin:
Switzerland
STRIA Roadmaps:
Vehicle design and manufacturing (VDM)
Transport infrastructure (INF)
Transport mode:
Road
Transport sectors:
Passenger transport
Freight transport
Duration:
Start date: 01/11/2009,
End date: 01/07/2002
Status: Finished
Funding details:
Overview
Background & policy context:
Construction of bridge edges, durability and maintenance requirements depend on many conditions. Large amount of specialties shall be taken into account such as the preservation of concrete structures, the security relating to the accidents, the system sealing and coating, fixing and bridge drainage, winter maintenance, road cleaning and more frequently the noise emissions.
The research analyses the decisive aspects related to the structural design of the bridge edges. There are established decision bases for the use of standardized bridge edge design.
Objectives:
Improve knowledge in the construction of bridge edges.
Share this page