Overview
Background & policy context:
Systematic action planning is a central and crucial process within the management of road maintenance. It demonstrates for a given observation period at what time which interventions for road maintenance are to be performed in order to attain the best cost-benefit ratio. The fundamentals for this planning and optimizing task have been compiled for Switzerland within the research package VSS 2004/710 – 716.
Objectives:
The main objective of this project is project-management which includes:
- Start-guidance of the five single projects
- Coordination of the five single projects
- Controlling (research and finances)
- Representation of findings and conclusions.
Methodology:
Following steps will be provided during the project:
- To carry out the research package measures planning roadways in conservation management independent of the project team project manager is used for the temporal and substantive coordination task and the control of accounting.
- The technical support of the research package (FP) and the individual research projects (EP) is carried out by the expert commission of VSS Commission 7, conservation management.